SKYLAR CONSTRUCTION
The computed 12-month bankruptcy probability of SKYLAR CONSTRUCTION is 5.6% (elevated). The company has been active since 2019 and the Belgian State Gazette contains no insolvency signals. The CBE does carry 2 administrative register entries (see administrative flags). No processed annual-account figures are available; this conclusion rests on registry and State Gazette data only.
| Active | 6 yrs |
| Locations | 1 |
| Publications | 3 |
Statistical estimate based on public sources, not credit advice nor a finding of fact. How do we compute this?
| Fiscal year | Type | Filed | Reference |
|---|---|---|---|
| 31-12-2024 | micro | 08-08-2025 | 2025-00371688 |
| 31-12-2023 | micro | 30-09-2024 | 2024-00481884 |
| 31-12-2022 | micro | 18-08-2023 | 2023-00361092 |
| NACE primary | Algemene bouw van residentiële gebouwen(41001) |
| Legal form | Private limited company(610) |
| Incorporation | 03-12-2019 |
| Status | Active |
| Postal code | 9050 |
Parcels linked to this company through its CBE addresses (seat, establishment units, branches), cross-referenced with the cadastral parcel plan. This shows where the company operates, not a deeds register.
| Parcel (capakey) | Region | Area | Buildings | Height / fl. |
|---|---|---|---|---|
| 44032A0472/00R003 | Flanders | 1.9 ha | 1 · 1,241 m² | 18.8 m · 5 fl. |
A single timeline of everything that happened to this company, publications, insolvency and lifecycle events, administrative changes and filed annual accounts.
The full chronology lists every recorded event with its date, the competent court and the appointed liquidator or administrator. It answers at which stage the proceedings stand and whether they are still running.
We hold 1 further earlier event in this file, covering 03-08-2025 to 12-09-2025.
25-02-2025 Transaction in capital or shares
Technical details
{
"events": [
{
"kind": "share_transfer",
"after_eur": null,
"delta_eur": null,
"before_eur": null,
"subscribers": [
{
"kbo": null,
"rrn": null,
"kind": "person",
"name": "SINGH KAUR Gurjinder",
"share_class": null,
"liberation_pct": null,
"contribution_kind": null,
"n_shares_subscribed": 75,
"contribution_amount_eur": null
},
{
"kbo": null,
"rrn": null,
"kind": "person",
"name": "SINGH KAUR Sukhwinder",
"share_class": null,
"liberation_pct": null,
"contribution_kind": null,
"n_shares_subscribed": 25,
"contribution_amount_eur": null
}
],
"decrease_purpose": null,
"contribution_type": null,
"paid_up_delta_eur": null,
"n_shares_destroyed": null,
"not_yet_called_eur": null,
"merger_new_shares_n": null,
"merger_exchange_ratio": null,
"distribution_amount_eur": null,
"statutory_unavailable_equity_op": null
}
],
"notary": {
"name": null,
"firm_city": null,
"firm_name": null,
"office_city": null,
"is_associated": false
},
"act_meta": {
"language": "mixed",
"pub_date": "2025-02-25",
"filing_date": "2025-02-17",
"act_kind_objet": "Overdracht van aandelen"
},
"decision": {
"body": "enig_aandeelhouder_schriftelijk",
"act_date": "2025-02-01",
"unanimous": null,
"under_authorized_capital": false,
"underlying_resolution_date": null
},
"bedrijfsrevisor": null,
"subject_company": {
"kbo": "0738.692.513",
"name_full": "SKYLAR CONSTRUCTION",
"legal_form": "Besloten Vennootschap",
"is_foreign_registered": false
},
"publication_proxy": {
"kind": "none",
"org_kbo": null,
"org_name": null,
"person_name": null,
"org_rep_person_name": null,
"person_role_at_subject": null
},
"co_filed_documents": [
"expedition",
"verslag bedrijfsrevisor"
],
"shareholders_after": [
{
"kbo": null,
"pct": null,
"kind": "person",
"name": "SINGH KAUR Gurjinder",
"role": "aandeelhouder",
"n_shares": 75,
"share_class": null
},
{
"kbo": null,
"pct": null,
"kind": "person",
"name": "SINGH KAUR Sukhwinder",
"role": "aandeelhouder",
"n_shares": 25,
"share_class": null
}
],
"share_classes_after": []
}| Legal nameNL | SKYLAR CONSTRUCTION |
- 12-09-2025 Address strikeout annulled
- 03-08-2025 Address struck