ROWIES A.
ActiveSummary
ROWIES A. has been active since 1990 and the Belgian Official Gazette contains no insolvency or warning signals. The 2025 annual accounts show equity of €407,137 and a net result of €37,214. Equity has been stable since 2018 (±2.2% per year). Its solvency ranks better than 92% of 11,783 sector peers (NACE 71, financial year 2025). The computed 12-month bankruptcy probability is below 0.1% (very low).
Overview
Official details
Source: KBO- Status
- Active since 22-01-1990 Normal situation
- Activity
- Activities of building architects NACE 71111and 5 others
- Establishment unit
- 2.046.942.302 8301 Knokke-Heist, since 06-02-1990
- Financial year end
- 31 December
- Peppol
- Reachable since 29-11-2025
Financial position
- Bankruptcy probabilitywithin 12 months
- < 0.1%
- Gross margin
- €91,896
- ▲ 10.3%
- Turnover
- ≈ €230,000
- estimated
- Profit
- €37,214
- ▲ 11.8%
- Equity
- €407,137
- ▲ 10.1%
- Total assets
- €445,763
- ▲ 7.9%
Score breakdownraises risk1 change of registered office in 24 monthslowers riskLiquidity: current ratio 6.18, cash €147,216Equity €407,137 (91.3% of total assets)Sector: Architectural and engineering activities; technical testing and analysis (NACE 71)Show the evidence
Checked score
Fewer than 1 in 1,000 comparable companies go bankrupt within 12 months (an estimate).
Calculation
The band follows from the bankruptcy probability. 10 more points roughly halve it.
| 75-100 | Excellent | under 0.55% |
| 60-74 | Healthy | 0.55% to 1.5% |
| 45-59 | Fair | 1.5% to 4.2% |
| 25-44 | Weak | 4.2% to 15.0% |
| 0-24 | Critical | over 15.0% |
Where the company stands within its band depends half on the bankruptcy probability and half on how it does against its sector peers (NACE 71, micro). It does better than 87% of them on solvency, 83% on liquidity, 47% on profitability and 57% on growth.
The bankruptcy probability was computed on 04-11-2026 by the bankruptcy model of 2 October 2026, which learns from Belgian bankruptcies and reads the registers, the annual accounts and the Belgian Official Gazette.
The probability rests on the annual accounts with balance sheet date 31-12-2025.
Of the companies with a bankruptcy probability in the very low class on 30-06-2025, 0.1% went bankrupt within twelve months.
Some facts cap the score, however low the probability. With negative or zero equity, a heavy loss, a special status in the KBO, one missing filing or accounts filed more than 90 days late, the score is Fair at most (59). With two missing filings, it is Weak at most (44). During a judicial reorganisation or at the company's end (bankruptcy, dissolution, liquidation), it is Critical at most (24).
Credit check for an amount and term of your choice
Show the recommended maximum and see how the verdict changes with amount, term and advance.
The scores and ratios are Checked's own calculations, not a credit decision.
Signals
The company filed its last 7 accounts on average 5 days after the deadline. In the sector (NACE 71), the median for financial year 2024 was 8 days before the deadline, and 34% of those companies filed late.
Searched, nothing found (2)
Key points
- Positive: More equity than 92% of companies in architecture and engineeringsector median €63,865 · 11,788 companies €407,137 View
Recent changes
- · Gazette deed Registered office moved from Leopoldsburg to KnokkeNew registered office: Azalealaan 8, 8300 Knokke · Previous registered office: Vennestraat 30, 3971 Leopoldsburg · Permanent representatives: Johan Jacobs, Kris Bollen and 4 others
- · Gazette deed Company renamed from Industriële Schilderwerken A. ROWIES to ROWIES A.Resignation: ROWIES Albert Ludovicus (director) · Reappointment: ROWIES Albert Ludovicus (director) · “Onderneming voor het uitvoeren van alle soorten schilderwerken.Onderneming voor het plaatsen van wand en…” (deed in Dutch)
- · Gazette deed Incorporation
Comparable companies
These companies have the same main activity as ROWIES A.: activities of building architects (NACE 71111). They are comparable in size and age: total assets between €420,000 and €533,000, founded between 1988 and 1997.
| Company | Total assets | Gross margin |
|---|---|---|
| ROWIES A. Knokke-Heist | €445,763 | €91,896 |
| ARCOPLAN, société d'architectes Andenne | €436,919 | €82,990 |
| SOCIETE D'ARCHITECTES INTERPROFESSIONELLE MIGUEL VAN CAMPENHOUT, architecte, ET GUNTHER SLEEUWAGEN - BUREAU D'ETUDES ECHNATON Kraainem | €430,264 | €81,334 |
| LAHON ET PARTNERS, association d'architectes Anderlecht | €473,402 | €83,141 |
| ARTAU -SOCIETE D'ARCHITECTURES Liège | €533,344 | €94,175 |
| META REAL ESTATE Antwerp | €420,185 | €111,108 |
| ARCHITECTENBURO JOHAN KETELE Kortrijk | €496,557 | €124,570 |
Key facts about ROWIES A.
- What is the company number of ROWIES A.?
- The company number of ROWIES A. is 0439.577.868. The VAT number is the same number with BE in front: BE 0439.577.868.
- Where is ROWIES A. based?
- The registered office is at Azalealaan 8, 8301 Knokke-Heist.Company details
- What does ROWIES A. do?
- According to the KBO register, the main activity is activities of building architects (NACE 71111).
- What is the legal form of ROWIES A.?
- ROWIES A. is a private limited company (BV).
- When was ROWIES A. founded?
- ROWIES A. was founded on 22-01-1990.
- Is ROWIES A. still active?
- Yes, ROWIES A. is an active enterprise in the KBO register.
- What is the turnover of ROWIES A.?
- The turnover in financial year 2025 is ≈ €230,000. This figure is estimated from the gross margin of €91,896 and 30 comparable companies (NACE 71111). It probably lies between €180,000 and €390,000. In financial year 2023 turnover was €82,089.Financials
- Is ROWIES A. profitable?
- In financial year 2025, ROWIES A. made a profit of €37,214.
- Where can I find the annual accounts of ROWIES A.?
- ROWIES A. filed 36 annual accounts with the National Bank of Belgium, the latest for financial year 2025.
- When are the next annual accounts of ROWIES A. due?
- ROWIES A. must file the annual accounts for financial year 2026 by 31-07-2027.Timeline
Next steps
See how customers, suppliers and banks see your own company and what to improve first.